First Solar to Develop 139 MW Campo Verde Solar Energy Project

TEMPE, Arizona.

First Solar, Inc. (Nasdaq: FSLR) this month announced it is developing the 139 megawattAC (MW) Campo Verde Solar Project, located near El Centro in Imperial County, Calif.

Campo Verde is expected to start construction in the third quarter of 2012 and be completed in 2013, creating about 250 construction jobs. San Diego Gas & Electric Company (SDG&E) will purchase the project’s output under a 20-year power purchase agreement, which was approved on May 24, 2012 by the Commission.


First Solar will construct the project using its PV modules that generate clean, renewable energy with no emissions, waste or water consumption during operation. The project will generate enough electricity to power approximately 50,000 average California homes, displacing 80,000 metric tons of CO2 per year, the equivalent of taking 15,000 cars off the road.

“First Solar is very pleased to be working with SDG&E for the first time to deliver clean, renewable energy and create hundreds of construction jobs in Imperial County,” said Brian Kunz, First Solar Vice President of Project Development, North America.

The Campo Verde project is jointly owned by First Solar and US Solar Holdings LLC, but First Solar has contractual rights to acquire 100 percent and is in the process of completing its acquisition. www.solarthermalmagazine.com

About First Solar, Inc.

First Solar is a leading global provider of comprehensive photovoltaic (PV) solar systems which use its advanced thin-film modules. The company’s plant solutions deliver an economically attractive alternative to fossil-fuel electricity generation today. From raw material sourcing through end-of-life module collection and recycling, First Solar’s renewable energy systems protect and enhance the environment. For more information about First Solar, please visit www.firstsolar.com.

For First Solar Investors

This release contains forward-looking statements which are made pursuant to the safe harbor provisions of Section 21E of the Securities Exchange Act of 1934. The forward-looking statements in this release do not constitute guarantees of future performance. Those statements involve a number of factors that could cause actual results to differ materially, including risks associated with the company’s business involving the company’s products, their development and distribution, economic and competitive factors, and the company’s key strategic relationships and other risks detailed in the company’s filings with the Securities and Exchange Commission. First Solar assumes no obligation to update any forward-looking information contained in this press release or with respect to the announcements described herein.

About US Solar Holdings LLC

 

US Solar is a leading developer of solar powered generation in the United States, with offices in Boise, Phoenix and San Diego. For more information about US Solar Holdings LLC, please visit www.ussolarholdingsllc.com.

Related Posts with Thumbnails
Share
Tags: , , , , ,

Short URL: http://www.solarthermalmagazine.com/?p=20652

Shelley Burke Posted by on Aug 8 2012. Filed under Press Releases, Projects and Installations, Solar PV. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

Leave a Reply

*

CommentLuv badge

Comment moderation is enabled. Your comment may take some time to appear.

<a href="http://www.sodahead.com/living/do-you-believe-in-climate-change/question-2226453/" title="Do you believe in Climate Change">Do you believe in Climate Change</a>
Solar Thermal Mag

From Our Readers